Share Dartmouth Road Retaining Wall Replacement on FacebookShare Dartmouth Road Retaining Wall Replacement on TwitterShare Dartmouth Road Retaining Wall Replacement on LinkedinEmail Dartmouth Road Retaining Wall Replacement link
This project is the complete replacement of the Dartmouth Road Retaining Wall, as the old wall is deteriorating.
The existing retaining wall will be replaced with a concrete retaining wall on driven piles.
The existing stairway will be replaced, and a mid-block crossing along Dartmouth Road will be included in the project.
Will the new wall be the same as the old wall?
No, the new wall will be a single full-height concrete wall. The wall will be supported by piles with fencing along the top of the wall.
Will the stairs through the current retaining wall be replaced?
Yes, the stairs will be replaced. Additionally, a mid-block crossing across Dartmouth Road will be constructed at the base of the new stairs.
Will traffic on Dartmouth Road be closed during construction?
Traffic will be restricted. The contractor will utilize flaggers as necessary to facilitate traffic on Dartmouth Road. Traffic may be closed for a limited amount of time for specific construction activities. Notices will be posted in these instances.
How loud will the work be?
The contractor will adhere to daily work schedule limits and utilize noise and vibration monitoring as necessary.
Existing Conditions
Construction Plans:
Traffic plan:
This project is the complete replacement of the Dartmouth Road Retaining Wall, as the old wall is deteriorating.
The existing retaining wall will be replaced with a concrete retaining wall on driven piles.
The existing stairway will be replaced, and a mid-block crossing along Dartmouth Road will be included in the project.
Will the new wall be the same as the old wall?
No, the new wall will be a single full-height concrete wall. The wall will be supported by piles with fencing along the top of the wall.
Will the stairs through the current retaining wall be replaced?
Yes, the stairs will be replaced. Additionally, a mid-block crossing across Dartmouth Road will be constructed at the base of the new stairs.
Will traffic on Dartmouth Road be closed during construction?
Traffic will be restricted. The contractor will utilize flaggers as necessary to facilitate traffic on Dartmouth Road. Traffic may be closed for a limited amount of time for specific construction activities. Notices will be posted in these instances.
How loud will the work be?
The contractor will adhere to daily work schedule limits and utilize noise and vibration monitoring as necessary.
Existing Conditions
Construction Plans:
Traffic plan:
Page published: 01 Jul 2024, 09:07 AM
Follow Project
Stay informed
Subscribe for project updates
Lifecycle
35% Design
Dartmouth Road Retaining Wall Replacement has finished this stage
June 2020
Design Presentation
Dartmouth Road Retaining Wall Replacement has finished this stage
2021
95% Milestone
Dartmouth Road Retaining Wall Replacement has finished this stage
Feb 2022
100% Milestone
Dartmouth Road Retaining Wall Replacement is currently at this stage
May 2023
Project to be advertised
this is an upcoming stage for Dartmouth Road Retaining Wall Replacement