Hilton St Complete Streets Resurfacing
What is the Hilton Street Complete Streets Resurfacing project?
Baltimore City Department of Transportation (BCDOT) is repaving Hilton Street from Edmondson Avenue to Frederick Road. During the repaving, BCDOT is also adding Complete Streets upgrades. Complete Streets means the street will be designed to be safe and accessible for people walking, biking, rolling, driving, and riding the bus.
The project runs through the Allendale, Carroll-South Hilton, and Saint Joseph neighborhoods. The project sits in City Council Districts 8 and 9. Public engagement for this project will occur in the summer of 2026.
Why is this project happening?
As part of all resurfacing projects, BCDOT reviews the corridor for Complete Streets treatments. Often this includes routine improvements like adding or refreshing crosswalks, narrowing travel lanes, and/or installing bump outs. Sometimes, depending on the context, more significant adjustments—ones that change the roadway configuration—are required. For example, if the project is on the bike master plan. For this project, Hilton Street from Monastery Avenue to Baltimore Street, overlaps with the separated facilities on the 2017 separated bike master plan and will receive additional multimodal upgrades on that portion.
For reference, a map of all resurfacing projects can be found here.
The project has two parts:
From from Monastery Avenue to Baltimore Street, we will build a cycle track. A cycle track is a form of protected two way bike lane set apart from cars, providing people walking, biking, and rolling their own protected space. This part of Hilton Street is on the City's 2017 separated bike plan. This part is the Green section on the map below.
From for the rest of Hilton Street, we will add traffic calming. Traffic calming uses measures like improved road markings and shorter crossings to slow traffic and make streets safer. This part is the Purple section on the map below.

What will the improvements look like?
In addition to resurfacing the roadway, this corridor will receive Complete Streets treatments that support safer travel for all users like adding or refreshing crosswalks, narrowing travel lanes, and/or installing bump outs. Bicycle facilities along Hilton Street from Monastery Avenue to Baltimore Street will also be installed in alignment with the Separated Bike Master Plan.
Typical existing cross section Peak Hour Restricted Parking and Travel Lanes | ![]() ![]() |
Typical proposed cross section Permanent Parking, Travel Lanes, and Multimodal Facility | ![]() ![]() |
To make a safe and separated path that people of all ages and abilities to enjoy, precast curbs, known as “pills", will be used in conjunction with flex post to create a separated barrier.

Bus stops along the cycle track will also be upgraded with "bus bulbs". These types of stops already exist throughout Baltimore City and provide level boarding access to users, allow the bus to keep in lane, and reduce conflict points, leading to improved boarding time and safety. Below is an example from Fallsway.
What will the improvements on the rest of Hilton Street get?
All of Hilton Street will receive standard treatments to increase safety and access such as updated crosswalks, ADA ramps, daylighting, and bump outs. The sections not part of the bike master plan will only receive these treatments.

Community Meetings and Events
In 2026 between June and September, DOT is reaching out to community organizations and asking to attend existing community events and meetings to share project information, gather community feedback, and answer project questions. Please see the list of meetings/events below. We will continue to update this page as meetings/events are confirmed. If a meeting is listed as TBD it means it has not yet been confirmed. If there is a meeting or event you'd like DOT to attend, please reach out to us via the comment box at the bottom of the page.
| Meeting or Event Name | Date & Time | Location | Status |
| Allendale Community Association Meeting | July 10, 6:30pm | Mary E Rodman Elementary School, 3510 W Mulberry St, Baltimore, MD 21229 | Attended |
| Southwest Better Neighborhood Association Meeting/Event | October 8th at 6:30p.m | TBD | TBD |
| Saint Joseph Improvement Association Meeting | July 20, 6:30pm | Zoom (Meeting ID: 208 095 1435 Passcode: 2025) | Attended |
| Caton Ave Community Association Meeting/Event | August 4, 6:30pm | Join Zoom Meeting https://us06web.zoom.us/j/86329501168?pwd=0VPKyRbrOI1TYUoUaeqU4nINprZq8T.1&jst=2 Meeting ID: 863 2950 1168 | Upcoming |
| Hilton St Traffic Calming Meeting* | September 2, 6:00 - 7:30pm | To Go In-Person 125 N Hilton St, Baltimore, MD 21229 To join online https://bmore.webex.com/bmore/j.php?MTID=m4d5e701f9aa5fc258248c63837478ba2 To join by phone +1-408-418-9388 Meeting number (access code): 2344 576 5661 | Upcoming |
* Please note this will also cover the Carroll Improvement Association meeting