Sharp Street Bikeway
About this project
The Sharp Street Bikeway project advances the citywide connected bicycle network adopted by Baltimore City Planning Commission. The Sharp Street Bikeway seeks to make a multimodal connection on Sharp Street between Pratt Street and W Henrietta Street that will:
- Improve safety along the corridor,
- Make it easier for people to bike and roll to parks, schools, jobs, and recreation,
- Fill a gap in our multimodal network by connecting the Maryland Ave cycle track—and greater protected bike network—to the Greenway Trails Network.
Project design
After analyzing traffic volumes, vehicular speeds, crash history, parking utilization, and community engagement feedback, the Baltimore Department of Transportation will be advancing the following preliminary design concept forward:
An all-ages and all-abilities bikeway (AA&A) facility on Sharp Street that will improve safety, minimize parking space impacts, and features:
A protected two-way bikeway between Pratt Street and Conway Street;
The closure of Sharp Street at Pratt Street for all motor vehicles; and
A traffic-calmed bicycle boulevard design from Conway Street to W Henrietta Street.
The design:
Improves safety along the corridor, but especially at the Sharp & Conway intersection and Sharp & Pratt intersection.
The closure of Sharp Street at Pratt Street improves safety at the Sharp Street & Pratt Street intersection and Sharp Street & Conway Street intersection. The closure makes it easier to cross the intersections as a pedestrian, bicyclist, scooter-user, and navigate it as a driver. The Sharp Street & Pratt Street intersection is a safety priority as it is on the city’s High Injury Network which represents streets in Baltimore where people are most vulnerable to being seriously injured or killed in a traffic crash.
The closure of Sharp Street at Pratt Street will decrease potential conflict points along the High Injury Network corridor and reduce motor vehicle traffic volumes on the corridor to a low enough level where a bicycle boulevard treatment is appropriate between Conway Street and Henrietta Street.
Minimizes the loss of parking spaces within the project limits. The impacted parking spaces are needed to provide a safe bikeway and accommodate intersection bump outs (curb extensions) that improve sight distance and reduce vehicular speed at intersections. The preferred design concept preserves most of the existing legal parking spaces on Sharp Street. The BCDOT parking utilization study demonstrated that parking spaces on Sharp Street are heavily utilized in the evening. This design preserves at least 76% of existing legal parking spaces on Sharp Street between Conway Street and Henrietta Street, compared to the two-way protected bikeway alternative which would have resulted in a greater impact to the parking spaces.
Makes it easier to bike, scooter, and roll in Baltimore by filling a gap in our All-Ages and All-Abilities (AA&A) multimodal network. Baltimore City’s AA&A multimodal network is made up of bikeways that feel comfortable and provide safety for all current and potential users. AA&A is inclusive of age, ability, type of bike or mobility device, socioeconomic status, race, gender, or any other identity and experience a person may hold. In Baltimore, All Ages & All Abilities bikeways often look like protected bike lanes, side paths and trails, and/or traffic-calmed bicycle boulevards.

Project Status
As of November 2026, the project team is in the process of advancing the selected design concept (summarized above) to construction ready plans. Our goal is to construct this project in Summer 2027. Learn more about the project lifecycle.
Community Engagement
Thank you to everyone who has engaged with the Sharp St Bikeway project. We appreciated the opportunity to reconnect and engage with community members to solicit input on how to improve Sharp St. Feedback gathered during the engagement phase was summarized, analyzed, and used to inform the project design. The FAQ summarizes answers to questions we received during the engagement phase.
We continue to keep the FAQ section updated to reflect the latest project information available.
Here's how we collected feedback from you in August and September 2026:
- Via the comment box at the bottom of the page.
- At neighborhood association meetings. We attended neighborhood associations along the corridor and shared project information, gathered community feedback, and answered project questions. See the confirmed list of meetings below.
- August 18th, 7pm - Center City Residents Association Meeting, Old St Paul Church on Charles Street.
- August 27th, 6pm - Historic Sharp Leadenhall Community Association Meeting, 100 W Henrietta St, Baltimore, MD 21230
- September 24th, 7pm - Otterbein Community Association Meeting (Please reach out to Otterbein Community Association for meeting details. This meeting is for Otterbein neighbors.)
- In-person on Sharp St. We met with people who walk, bike & roll, drive, or take transit along the corridor to better understand how to improve Sharp St. Below were the dates we were out on Sharp St:
- August 12th from 7:30 - 8:30am at Pratt St and Sharp St intersection
- August 18th from 4:30 - 5:30pm at W Henrietta and Sharp St intersection
- August 20th from 7:30 - 8:30am at W Henrietta and Sharp St intersection
- August 20th from 4:30 - 5:30pm at Pratt St and Sharp St intersection
- September 15th from 7:30 - 8:30am at Pratt St and Sharp St intersection
- September 16th from 4:30 - 5:30pm at Pratt St and Sharp St intersection